240
Investigation
pages
95+
Master index
links
35
Canonical
figures
9
MAID dossier
pages

April 2026

APR 15 — 240-PAGE MILESTONE

Site reaches 240 investigation pages

Comprehensive coverage across every domain of Canadian institutional capture.

APR 15

Conflict of Interest Registry

Every documented COI across all institutions in one reference page — 4 tables covering PM, regulators, Crown corps, and fiscal bodies.

View →
APR 15

Class Action Guide

3 active class actions, 3 potential, s.504 private prosecution guide.

View →
APR 15

Military Procurement Failures

CSC $60B+ (10yr delay), fighter jets (30yr replacement), submarines (dock > sea).

View →
APR 15

CRA Enforcement Gap + Whistleblower Failure

Two new pages documenting fiscal enforcement capture and the broken whistleblower system.

CRA → | Whistleblower →
APR 15

Canonical Figure System deployed

35 canonical figures with source citations. Auto-injector (js/figures.js) + CI validator. Fixed Brookfield AUM (was incorrect, corrected to $1T+) across 5 pages.

APR 15

Press Kit + FAQ + Media Coverage Gaps

Journalist evidence pack, 8 common objections answered, 10 facts media won't tell you.

Press Kit → | FAQ → | 10 Facts →
APR 14

MAID Dossier complete — 9-page evidence chain

Immigration-MAID pipeline, credential exploitation data, nursing crisis, mental health expansion, veterans MAID cases, demographics-to-death (Pearce Study), MAID economics, Brookfield flow. Dedicated index page.

MAID Dossier →
APR 14

GC Open Data Sync + Budget 2025 Analysis

Fresh government data: 6/6 datasets, fiscal snapshot ($585.9B expenditures, $78.3B deficit), lobbying threshold change (8hrs/4wks).

Budget → | Lobbying →
APR 14

Email campaign fixed — .eml file generation

Replaced unreliable mailto: with RFC 2822 .eml downloads. Batch download for 340 MPs.

APR 14

French i18n bug fixed

Constrained French translation to nav/footer only — stopped translating investigation body text.

APR 14

Home page MAID counter updated

Updated from 76,475 confirmed to ~97,764 estimated (45.2/day × 471 days since report).

APR 14

3 Interactive Features deployed

Google Sign-In (js/auth-nav.js), Submarine Dial Timeline (starfield + horizontal scroll), Comments + Emoji Reactions on all pages.

Timeline →
APR 14 — 200-PAGE MILESTONE

Site crosses 200 investigation pages

Complete 13-layer institutional capture architecture documented.

System Architecture →
Full commit history: github.com/TENET-5 commits →
Every change is visible in the public git repository.